The installation of an apg clamping machine (i.e. an automatic pressure gel forming machine) is a complex process that requires specialized knowledge and skills. The following are the general installation steps and precautions:
1. Preparation before installation
Checking the installation environment: Check whether the installation site meets device requirements, such as space size, floor flatness, bearing capacity, and power supply.
Preparing installation tools: Prepare necessary installation tools and devices according to the installation instructions, such as wrenches, screwdrivers, jacks, and levels.
Unpacking check: Before installation, unpack the device to check whether the components are complete, damaged or missing.
2. Foundation construction
Foundation making: According to the size and weight of the equipment, make a foundation that meets the requirements (such as concrete foundation) to ensure that the equipment can be stably installed on the foundation.
Foundation acceptance: After the foundation construction is completed, the foundation acceptance is carried out to check whether the flatness, perpendicularity and strength of the foundation meet the requirements.
Third, equipment installation
Lifting and positioning: Use the lifting equipment to smoothly lift the APG clamp to the installation position, and ensure that the equipment is placed smoothly and vertically.
Connect and secure: Connect and secure each component of the device according to the installation instructions, for example, connect power cables, air supply cables, and water pipes, and tighten all bolts and nuts.
Level adjustment: Use a level to adjust the device to ensure that the device runs horizontally.
Fourth, electrical installation and commissioning
Electrical connection: According to electrical drawings and equipment instructions, connect and wire electrical equipment, including motors, controllers, sensors, etc.
Electrical debugging: After the electrical connection is completed, electrical debugging is carried out to check whether the electrical system is working normally, including the power indicator light, motor steering, control button, etc.Five, hydraulic system installation and commissioning
Hydraulic connection: According to hydraulic drawings and equipment instructions, connection and installation of hydraulic system, including hydraulic tank, hydraulic pump, hydraulic valve, etc.
Hydraulic debugging: After the hydraulic connection is completed, hydraulic debugging is carried out to check whether the working pressure, flow rate, temperature and other parameters of the hydraulic system meet the requirements, and necessary adjustments are made.
6. Software installation and debugging
Software installation: If the APG clamping machine is equipped with control system software, it is necessary to install and configure the software.
Software debugging: After the software installation is complete, the software debugging is carried out to check whether the control system can run normally, and the necessary parameters are set and optimized.
Vii. Trial operation and acceptance
Trial run: After all installation and commissioning work is completed, test run the device to check whether the device can work normally, and observe the running status and performance of the device.
Acceptance: After the end of the trial operation, the acceptance work of the equipment is carried out to check whether the equipment meets the technical requirements and performance indicators, and fill in the acceptance report.
Matters needing attention
Safety first: In the installation process to strictly abide by the safety operation procedures to ensure the safety of personnel and equipment.
Professional installation: It is recommended that professionals with relevant experience and skills perform installation and commissioning.
Read the instructions carefully: Before installing the device, read the installation instructions and operation manuals carefully to understand the structure, performance, and use of the device.
Follow manufacturer's recommendations: Follow manufacturer's recommendations and instructions during installation to ensure proper installation and use of the equipment.
The above is the general APG clamping machine installation steps and precautions, the specific installation process may vary depending on the equipment model, manufacturer and other factors. Therefore, during the actual installation process, you are advised to refer to the specific installation instructions and manufacturer's recommendations.
Cell:0086-18758977077,0086-18368611688
Fax:0570-4888766
Email: info@goodapg.com
Add: no.6-3 ruzhu road, fuzhu park, sidu town,iiangshan quzhou zhejiang china
Copyright © 2023 Shandong Qilu Heavy Machinery Group Co., Ltd All rights reserved Filing No.: CP Bei No. 000000
Comment
(0)